University of Cambridge – LT3 Refurbishment

The project involves constructing additional laboratory space within an existing facility.  This requires the demolition of a lecture theatre, including the excavation of a raked concrete floor.  The 1st floor will then be constructed within this space, allowing the installation of M&E systems and fit out.  The works are to be completed to Home Office requirements.  The site is situated in the busy Downing Site in centralCambridge adjacent to operational departments, meaning that all works need to be undertaken quietly.

Services:             Project management, contract administration
Completion:         October 2011
Procurement:      Two stage design develop and construct
Value:                    £2 million